Thionville and the Fensch valley: the historic heart of Lorraine steelmaking, 20 minutes from our head office. SXE Consulting deploys Kaizen, PDCA, 5S and Six Sigma there with the proximity of a neighbour and 25 years of experience in the region.
Continuous improvement — Kaizen, PDCA, 5S, Six Sigma — optimises processes permanently by involving shop-floor teams. In Thionville and the Fensch valley we support every industry — steelmaking, metalworking, cross-border logistics or any other sector — and it answers a very concrete challenge: staying competitive in the face of energy costs and competition, without heavy investment. The good news: the gains are already in your workshops, not in new machinery.
Blast furnaces, rolling mills, steelworks: our consultants know the sites of the Fensch valley and the constraints of their continuous processes.
20 minutes by road: we can be on your shop floor every week. Continuous improvement demands that repeated presence.
Kaizen, PDCA, 5S: we train your teams so the initiative outlives our departure. Self-sufficiency is the contractual objective.
All our continuous improvement expertise, deployed across sites in Thionville and the valley.
One to five days to solve a specific problem with your teams.
Structure every improvement so that it lasts.
Organise the workplace for lasting performance.
Reducing defects and variability through data.
Managers and operators self-sufficient after the assignment.
Facilitation, KPIs, management reporting — full visibility.
Geographical proximity is no detail in continuous improvement: it is the condition for repeated on-site support, week after week.
Weekly presence without prohibitive travel costs. Continuous improvement is won through repetition — not quarterly audits.
significant gains on scrap and OEE: our reference cases come from Lorraine steelmaking and neighbouring Luxembourg.
We train your team leaders to run the workshops themselves. Measured objective: 100% of the routines self-run by the end of the assignment.









4 simple steps, from first contact to measured results.
30 minutes to understand your site and your main pain points. Free of charge.
Two to five days on your shop floor: waste, flows, current indicators.
One or two high-impact Kaizen workshops to engage the teams and prove the method.
Gradual rollout, training of team leaders, full handover.
A first 30-minute call to identify your three main levers — followed by an on-site assessment just 20 minutes from us.