{"id":10259,"date":"2021-02-16T20:31:32","date_gmt":"2021-02-16T19:31:32","guid":{"rendered":"https:\/\/sxe-consulting.com\/?p=10259"},"modified":"2024-10-08T14:47:38","modified_gmt":"2024-10-08T12:47:38","slug":"wie-sie-die-investitionsrendite-ihres-projekts-bewerten-konnen","status":"publish","type":"post","link":"https:\/\/sxe-consulting.com\/de\/comment-evaluer-le-retour-sur-investissement-de-votre-projet\/","title":{"rendered":"Wie bewerten Sie den Return on Investment (ROI) Ihres Projekts?"},"content":{"rendered":"<p>Le calcul d\u2019un ROI, ne se limite pas au gain de productivit\u00e9 r\u00e9alis\u00e9 ou aux \u00e9conomies faites sur la structure.<\/p>\n<p>Le calcul du retour sur investissement doit int\u00e9grer les \u00e9conomies sur les co\u00fbts directs et les co\u00fbts indirects que peuvent g\u00e9n\u00e9rer le projet ainsi que les gains de productivit\u00e9s global des structures.<\/p>\n<p><strong>Gains sur les co\u00fbts directs<\/strong><\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"302\"><strong>Gains mati\u00e8res<\/strong><\/p>\n<p>R\u00e9duction des\u00a0surconsommations<\/p>\n<p>R\u00e9duction des Non-Conformit\u00e9s et des\u00a0rebuts<\/p>\n<p>Optimisation de la gestion des stocks ateliers<\/p>\n<p>&nbsp;<\/td>\n<td width=\"302\"><strong>Gains sur la main d\u2019oeuvre<\/strong><\/p>\n<p>Am\u00e9lioration du rendement des \u00e9quipes<\/p>\n<p>Diminution du co\u00fbt des \u00e9quipes<\/p>\n<p>Suppression des temps improductifs<\/p>\n<p>&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"302\"><strong>Gains sur les machines<\/strong><\/p>\n<p>Am\u00e9lioration du rendement des \u00e9quipes<\/p>\n<p>Gains en capacit\u00e9 machine<\/td>\n<td width=\"302\"><strong>Gains sur l\u2019\u00e9nergie<\/strong><\/p>\n<p>Diminution de la consommation \u00e9nerg\u00e9tique<\/p>\n<p>&nbsp;<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>Gains sur les co\u00fbts indirects<\/strong><\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"302\"><strong>Am\u00e9lioration du travail des \u00e9quipes<\/strong><\/td>\n<td width=\"302\"><strong>Gain de temps dans la prise de d\u00e9cision<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>Le calcul d\u2019un ROI, ne se limite pas au gain de productivit\u00e9 r\u00e9alis\u00e9 ou aux \u00e9conomies faites sur la structure. Le calcul du retour sur investissement doit int\u00e9grer les \u00e9conomies sur les co\u00fbts directs et les co\u00fbts indirects que peuvent g\u00e9n\u00e9rer le projet ainsi que les gains de productivit\u00e9s global des structures. Gains sur les [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":10935,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_sitemap_exclude":false,"_sitemap_priority":"","_sitemap_frequency":"","_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[85],"tags":[],"class_list":["post-10259","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ingenierie"],"jetpack_featured_media_url":"https:\/\/sxe-consulting.com\/wp-content\/uploads\/2021\/02\/evaluer-roi.png","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/sxe-consulting.com\/de\/wp-json\/wp\/v2\/posts\/10259","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sxe-consulting.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sxe-consulting.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sxe-consulting.com\/de\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sxe-consulting.com\/de\/wp-json\/wp\/v2\/comments?post=10259"}],"version-history":[{"count":0,"href":"https:\/\/sxe-consulting.com\/de\/wp-json\/wp\/v2\/posts\/10259\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sxe-consulting.com\/de\/wp-json\/wp\/v2\/media\/10935"}],"wp:attachment":[{"href":"https:\/\/sxe-consulting.com\/de\/wp-json\/wp\/v2\/media?parent=10259"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sxe-consulting.com\/de\/wp-json\/wp\/v2\/categories?post=10259"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sxe-consulting.com\/de\/wp-json\/wp\/v2\/tags?post=10259"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}